WP5: Seismic Hazard Assessment

Workpackage 5 is coordinated by G. Grünthal (GFZ). WP 5 has the following objectives:

  1. Set up a hazard control group in charge of checking all steps of the hazard assessment.
  2. Set up quality control procedure and hazard assessment specifications allowing full validation of the hazard assessment procedure and results.
  3. Assess seismic hazard according to WP2 engineering specifications, conduct validation and elicit community feeback.

Workpackage 5 is structured in six tasks: