Home

Menu

  • Home
  • News and Events
  • About SHARE
  • Work Packages
  • Documents
    • Deliverables
    • Publications
  • Knowledge Exchange
  • Related Projects
  • Partner Area
  • EC Resources
  • Contact

SHARE Newsletter

Subscribe to the SHARE Newsletter here:

Previous issues
Syndicate content

Deliverables

Deliverables are subject to specific dissemination levels. Below you can download those that are assigned to be publicly available. In case you are interested to obtain more information on other deliverables, please send an email to the project office.

WP1: Management
-   D1.1 Description of work (DOW)
-   D1.2 Consortium Agreement

WP2: Engineering requirements and applications
-   D2.1 Hazard output specifications requirements document jointly approved with EC8 Committee
-   D2.2 Report on seismic hazard definitions needed for structural design applications
-   D2.3 Calibration of Seismic Design Codes using Loss Estimation 
-  
D2.4 Results from study on minimum hazard levels for explicit structural seismic analysis and design

WP3: Earthquake sources
-   D3.1 Compilation of existing regional and national seismic source zones
-   D3.3 Homogeneous determination of maximum magnitude

WP4: Strong ground-motion model

-   D4.1 Updated strong ground-motion database
-   D4.2 Regionally adjusted Ground Motion Prediction Equations (GMPE) for Europe
-   D4.4 European Vs30 map derived from surface topography slope and site calibrations


WP5: Seismic hazard assessment
-   D5.2 Structure of the logic tree to be used in seismic hazard computation

WP6: Computational infrastructure


WP7: Dissemination
-   D7.1a Dissemination e-newsletter

Highlights

SHARE-Workshop: Preliminary Hazard Model Review , Zurich,  March 12-14, 2012:
SHARE will host a model review workshop with invited internal and external experts in Zurich. The goal is to evaluate model ingredients and preliminary hazard results. For more information contact Dr. J. Woessner.



Session Announcement - 33rd General Assembly of the European Seismological Commission, Moscow, Agust 2012: SHARE together with other regional programs of GEM have suggested a session "SHR-1: Recent Developments in Probabilistic Seismic Hazard and Seismik Risk Assessment: Applications, Improvements, Shortcomings and Perspectives". Looking forward to your contributions! Abstract submission deadline is March 31, 2012.
For more information please visit the official website at www.esc2012-moscow.org.

Login
SHARE is a FP7 Collaborative Project coordinated by the Swiss Seismological Service